1" FORGED STEEL GATE VALVE F11 1500# WB NPT A105 TR8

Smith F11 Gate Valves are designed for high-temperature and high-pressure applications, particularly in industries handling oil, steam, and other fluids. These valves are often made from forged steel A105 F11 material, meeting standards like API 602 and ASME B16.34. They are available in various sizes and pressure classes, with various end connections.
Smith Forged Gate Valves feature an outside stem and yoke (OS&Y), are available in Class 150-2500, and have conventional or full ports with either threaded, socketweld, buttweld or RF ends. All are manufactured in accordance with API 602 and ASME B16.34 standards.

Sizes
1/4” – 3”

Pressure Class
150, 300, 600, 800, 1500, 2500

Design Specifications & Compliance
API 591/598/602/624
ASME B16.34
NACE MR-0175
NACE MR-0103

End Connections
Threaded
Socketweld
Flanged
Buttweld

 

In stock
Only 2 left
SKU
310-SVG11WBS112
Call for Price & Availability

Found this item at a lower price?

Click the icon below to request a price match

Follow our social media pages to stay informed about our offers and events

DIAGRAM:


MATERIAL LIST:


DESIGN & CONSTRUCTION:

  • API 602, ASME B16.34
  • Bolted & welded bonnet
  • Reduced and full port
  • Threaded, Socketweld, Buttweld ends class 800 to 2500

 

  • Flanged ends class 150 to 2500
  • Bonnet constructed of forged steel with integral backseat
  • Nameplate serialized for full traceability
  • API 622 and API 624 qualified packing for low emissions


 

More Information
SKU 310-SVG11WBS112
Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account

Payment Plan:

The items you need are well within your reach. ShopSSLTT has the premium products you want at affordable prices and with our shop now pay later payment plans we make them accessible to all. Lear more on the following links

Payment plan Details : You can now finance your purchases with flexible payment plans. Click here to learn how.

Requirements: Before you apply for the plan make sure you have all the required documents, click here to see the list of documents required.