2" 316 STAINLESS STEEL GATE VALVE 800# WB NPT TR12

SMITH 316 Stainless Steel Gate Valves are industrial valves used to fully open or close the flow in a pipeline, offering excellent resistance to corrosion and chemicals. These valves feature a gate-like disc that slides to control flow and are often built to industry standards like API 600, ensuring reliability. Key characteristics include the use of stainless steel for durability, live-loaded packing for low emissions and less frequent adjustments, and compliance with NACE standards for use in challenging environments.
Smith Forged Gate Valves feature an outside stem and yoke (OS&Y), are available in Class 150-2500, and have conventional or full ports with either threaded, socketweld, buttweld or RF ends. All are manufactured in accordance with API 600 and ASME B16.34 standards.

Sizes
1/4” – 3”

Pressure Class
150, 300, 600, 800, 1500, 2500

Design Specifications & Compliance
API 591/598/600/622
ASME B16.34
NACE MR-0175
NACE MR-0103

End Connections
Threaded
Socketweld
Flanged
Buttweld

 

In stock
Only 10 left
SKU
310-SVGSWBSC818
Call for Price & Availability

Found this item at a lower price?

Click the icon below to request a price match

Follow our social media pages to stay informed about our offers and events

DIAGRAM:

 

MATERIAL LIST:

 

DESIGN & CONSTRUCTION:

  • API 600, ASME B16.34
  • Bolted & welded bonnet
  • Reduced and full port
  • Threaded, Socketweld, Buttweld ends class 800 to 2500

 

  • Flanged ends class 150 to 2500
  • Bonnet constructed of forged steel with integral backseat
  • Nameplate serialized for full traceability
  • API 622 and API 624 qualified packing for low emissions

 

 

More Information
SKU 310-SVGSWBSC818
Weight 1.000000
Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account

Payment Plan:

The items you need are well within your reach. ShopSSLTT has the premium products you want at affordable prices and with our shop now pay later payment plans we make them accessible to all. Lear more on the following links

Payment plan Details : You can now finance your purchases with flexible payment plans. Click here to learn how.

Requirements: Before you apply for the plan make sure you have all the required documents, click here to see the list of documents required.