Smith A105 gate valves are forged carbon steel valves, typically used for on/off flow control rather than regulating flow. They are made from ASTM A105 material, known for its strength and mechanical properties. These valves are commonly used in pipelines to completely shut off or allow full flow of fluids. They are available in various sizes and pressure classes, with various end connections.
Smith Forged Gate Valves feature an outside stem and yoke (OS&Y), are available in Class 150-2500, and have conventional or full ports with either threaded, socketweld, buttweld or RF ends. All are manufactured in accordance with API 602 and ASME B16.34 standards.
Sizes
1/4” – 3”
Pressure Class
150, 300, 600, 800, 1500, 2500
Design Specifications & Compliance
API 591/598/602/624
ASME B16.34
NACE MR-0175
NACE MR-0103
End Connections
Threaded
Socketweld
Flanged
Buttweld
Smith A105 gate valves are forged carbon steel valves, typically used for on/off flow control rather than regulating flow. They are made from ASTM A105 material, known for its strength and mechanical properties. These valves are commonly used in pipelines to completely shut off or allow full flow of fluids. They are available in various sizes and pressure classes, with various end connections.
Smith Forged Gate Valves feature an outside stem and yoke (OS&Y), are available in Class 150-2500, and have conventional or full ports with either threaded, socketweld, buttweld or RF ends. All are manufactured in accordance with API 602 and ASME B16.34 standards.
DIAGRAM:

MATERIAL LIST:

DESIGN & CONSTRUCTION:
- API 602, ASME B16.34
- Bolted & welded bonnet
- Reduced and full port
- Threaded, Socketweld, Buttweld ends class 800 to 2500
- Flanged ends class 150 to 2500
- Bonnet constructed of forged steel with integral backseat
- Nameplate serialized for full traceability
- API 622 and API 624 qualified packing for low emissions
DIMENSIONAL DATA:

PRODUCT NUMBERING SYSTEM:

| SKU | 310-SVGFWBSW812 |
|---|---|
| Weight | 1.000000 |
Payment Plan:
The items you need are well within your reach. ShopSSLTT has the premium products you want at affordable prices and with our shop now pay later payment plans we make them accessible to all. Lear more on the following links
Payment plan Details : You can now finance your purchases with flexible payment plans. Click here to learn how.
Requirements: Before you apply for the plan make sure you have all the required documents, click here to see the list of documents required.