BOARD SPARE CONTROL ASSY
PRODUCT FEATURES:
Type: Control Circuit Board Assembly
Function: Main electronic control module for Nitto Kohki Atra Ace Magnetic Drills
Compatibility: Designed specifically for the AO-5575 and similar Atra Ace models
Protection: Regulates motor speed, manages magnetic base adhesion safety, and provides overload protection
Quality: Genuine OEM replacement part for precise fit and reliability
Installation: Plug-and-play architecture with multi-pin connectors for simplified servicing
PRODUCT DESCRIPTION:
The NITTO-TB05490-0 is a critical electronic component responsible for the intelligent operation of your magnetic drilling machine. This Control Board Assembly monitors and manages the power distribution between the magnetic base and the drill motor, ensuring the motor will not operate if the magnet is not properly engaged. It features high-quality surface-mount components designed to withstand the vibrations and thermal demands of industrial drilling. Replacing a damaged or faulty control board with this genuine assembly restores the automatic feed functions, LED status indicators, and the crucial safety interlock systems that protect both the operator and the tool from damage during high-torque applications.
TECHNICAL SPECIFICATIONS:
Model: TB05490-0
Manufacturer: Nitto Kohki
Component Type: Printed Circuit Board (PCB) Assembly
Input Voltage: Model specific (Typically 110-120V or 220-240V AC)
Connectivity: Multi-wire harness connectors
Safety Features: Magnet-Motor Interlock, Overload Protection
Compatible Models: Atra Ace AO-5575, LO-3550 (Verify serial number)
Shipping Weight: 1 lbs
| SKU | NITTO-TB05490-0 |
|---|---|
| Weight | 1.000000 |
Payment Plan:
The items you need are well within your reach. ShopSSLTT has the premium products you want at affordable prices and with our shop now pay later payment plans we make them accessible to all. Lear more on the following links
Payment plan Details : You can now finance your purchases with flexible payment plans. Click here to learn how.
Requirements: Before you apply for the plan make sure you have all the required documents, click here to see the list of documents required.



